Get the groundwork right. Good preparation is the key to a successful job.
-
Ensure the ground is level and compacted.
-
All paving should be laid on firm foundations of sand or cement.
-
After mixing the cement ensure you work methodically taking your time. Layout components and set out accurate string lines if needed. A good mortar mix suitable for most garden projects is one part cement to five or six parts soft builders sand.
-
As work progresses frequent checks should be made on vertical and horizontal levels use a spirit level for this.
-
Slabs should be laid on a bed of mortar approx 25mm thick.
-
When pointing is required. Leave a gap of at least 2.5cm between each slab to allow a key for the pointing mix. Use a damp mortar mix of 1 part cement to 4 parts building sand.
The above points are for guidance only. If you are in any doubt seek expert advice.